📊 Oracle Primavera P6 Course — Dwarka Mor, Delhi

Best Primavera P6 Course in Dwarka Mor Delhi

Master Oracle Primavera P6 — the world's #1 project scheduling & controls software used in Construction, EPC, Infrastructure, Oil & Gas, and Power projects — covering WBS, CPM Scheduling, Resource & Cost Management, Baseline, Earned Value Management (EVM) and professional S-Curve & Gantt Reports on real EPC project files at MMIIT's expert-led training centre opposite Dwarka Mor Metro, New Delhi.

Duration: 3 Months
Software: Live Primavera P6
Projects: Real EPC Files
Mode: Online + Offline
Placement: 100% Assistance

Course Overview

Duration3 Months
SoftwareOracle Primavera P6 (Latest)
BatchesMorning / Evening / Weekend
Project FilesReal EPC & Construction
CoversCPM + EVM + S-Curve + Reports
Fee₹15,000 (Instalment Available)
Placement100% Assistance
Rating★★★★★ 4.9/5 (76 reviews)
3Month Programme
P6Live Software
CPMCritical Path Method
EVMEarned Value Mgmt
EPCReal Project Files
4.9★Student Rating
100%Placement Assistance
About the Programme

Why Learn Primavera P6 at MMIIT Delhi?

Oracle Primavera P6 is the world's #1 enterprise project scheduling software — the mandatory planning tool for every major construction, EPC, infrastructure, oil & gas, power, and defence project globally. In India, Primavera P6 is used by L&T, Shapoorji Pallonji, Tata Projects, NPCIL, ONGC, NHPC, Reliance, GMR, GVK, and all major EPC contractors. India's infrastructure boom — NIP, new expressways, metros, airports, power plants, and smart cities — has created an acute shortage of trained Primavera planning engineers.

A civil or mechanical engineer with Primavera P6 skills transitions from a site execution role (₹3–4 LPA) to a Planning Engineer role (₹6–15 LPA) — often without changing their employer. International EPC postings (Middle East, South-East Asia, Africa) for Primavera-trained planning engineers offer packages equivalent to ₹25–60 LPA. MMIIT's Primavera P6 course in Dwarka Mor Delhi covers the full P6 workflow — WBS, Activities, Relationships, Resource Loading, CPM Scheduling, Baseline, Progress Tracking, EVM, S-Curves and reports — taught with real EPC and construction project files from day one.

📞 Call for Free Demo Class
📁

Real EPC & Construction Project Files

Every session uses actual project scheduling files — a construction building schedule, an EPC power plant schedule (Engineering, Procurement, Construction, Commissioning phases), and an infrastructure project. Students learn from real schedules, not textbook examples.

🔴

CPM — Critical Path Method Mastery

CPM is the core of Primavera P6 and the most-tested concept in planning engineer interviews. MMIIT ensures every student fully understands Forward Pass, Backward Pass, Total Float, Free Float, critical activity identification, and schedule compression — with live P6 examples.

📈

Earned Value Management — EVM Complete

EVM (PV, EV, AC, SV, CV, SPI, CPI) is the international standard for measuring project performance and essential for senior planning roles. MMIIT includes a full EVM module with Primavera S-Curve generation and variance analysis.

🌏

India + International Project Careers

Primavera P6 opens domestic EPC/construction roles (₹6–18 LPA) and international project postings (Middle East, Africa, South-East Asia) where India-trained Primavera engineers are in very high demand, with packages equivalent to ₹25–60 LPA.

Primavera P6 Project Scheduling Workflow

P6 Scheduling Workflow You Will Master

📊 Complete Oracle Primavera P6 Project Scheduling Pipeline — Taught at MMIIT

🏗️
EPS & Project Setup
→
🌳
WBS Creation
→
📋
Activities & Logic
→
👷
Resources & Cost
→
🔴
CPM Schedule
→
📌
Baseline
→
📊
Progress & EVM
→
📄
Reports & S-Curve

🔴 Critical Path in Primavera P6 — Sample Gantt View

Critical Activity (Float = 0)
Non-Critical (Float > 0)
Milestone
Site Mobilisation
Foundation Work
Structural Steel
Electrical Rough-in
MEP Installation
Cladding & Finishes
Project Handover
🌳

WBS Structure

Decompose a project into manageable deliverables and work packages — the foundation of every professional Primavera P6 schedule for EPC and construction projects.

🔗

Activity Relationships

Define logical dependencies between activities using FS, SS, FF, SF relationships with lag and lead — creating a network that drives the CPM critical path calculation.

👷

Resource Loading & Levelling

Assign Labour, Non-Labour, and Material resources, load manpower histograms, identify over-allocation, and apply P6 resource levelling for realistic schedules.

📌

Baseline & Progress Update

Create project baselines, update actual progress weekly, compare actual vs planned, analyse schedule and cost variances, and generate delay analysis reports.

📈

S-Curve & Histogram

Generate Primavera S-Curves (planned vs actual cost/progress) and resource histograms — the standard deliverables for monthly client progress review meetings.

💹

Earned Value Management

Calculate PV, EV, AC, SV, CV, SPI, CPI from Primavera P6 — the international standard for measuring project cost and schedule performance used by all major EPC clients.

💹 Earned Value Management (EVM) Key Metrics — Taught at MMIIT

PV
Planned Value
Budgeted cost of work scheduled (BCWS)
EV
Earned Value
Budgeted cost of work performed (BCWP)
AC
Actual Cost
Actual cost of work performed (ACWP)
SV
Schedule Variance
EV − PV (negative = behind schedule)
CV
Cost Variance
EV − AC (negative = over budget)
SPI
Schedule Perf. Index
EV ÷ PV (<1 behind, >1 ahead)
CPI
Cost Perf. Index
EV ÷ AC (<1 over budget, >1 under)
EAC
Estimate at Completion
BAC ÷ CPI (forecasted total cost)
Complete Curriculum

Primavera P6 Course Syllabus at MMIIT Delhi

PM Concepts → P6 Interface → EPS/OBS/Calendars → WBS → Activities → Resources/Cost → CPM → Baseline → EVM → Reports → Real Projects

M1

Project Management Fundamentals & Primavera P6 Interface

  • Project Management basics — project vs operations, project lifecycle phases (Initiation, Planning, Execution, Monitoring & Control, Closure), PMBOK knowledge areas overview
  • Triple Constraint — Scope, Time, Cost — quality, risk, and stakeholder context; understanding trade-offs in project scheduling decisions
  • Primavera P6 editions — EPPM (Enterprise web-based), P6 Professional (desktop), P6 Cloud — differences and industry usage in India's EPC and construction sector
  • P6 interface navigation — main menu, directory bar, toolbar, Activity Table, Gantt Chart view, Activity Network (logic diagram) view, Resource Usage Profile, WBS Chart view
  • P6 data hierarchy — Enterprise Project Structure (EPS) → Project → WBS → Activity — understanding the top-down organisation of all projects in Primavera P6
  • User Preferences — date format, duration units, currency, colour settings — configuring P6 for Indian project standards and calendar conventions
  • Layouts and Views — adding/removing/ordering Activity Table columns, grouping and banding by WBS/Phase/Discipline, sorting, saving and sharing custom layouts
  • P6 vs MS Project — key differences, when to use each, data exchange formats (XER, XML, XLS, MPP) — understanding why EPC clients mandate Primavera P6
M2

EPS, OBS, Calendars & Project Setup

  • Enterprise Project Structure (EPS) — creating EPS hierarchy (Portfolio → Program → Project), EPS nodes, EPS-level budget and cost summaries, assigning projects to EPS
  • Organisational Breakdown Structure (OBS) — creating OBS (Company → Division → Department), assigning OBS to EPS nodes and projects for access control and responsibility
  • Creating a new project — project creation wizard, Project ID and Name, planned start, must finish by date, data date, project properties (Status, Priority, Risk Level, Project Codes)
  • Global Calendars — default 5-day/8-hour calendar, creating custom calendars (6-day construction week, Indian national holidays, shift calendars for 24-hour plant operations)
  • Project and Resource Calendars — project-specific calendar, resource-specific working patterns (expat vs local, different shift schedules) — understanding calendar hierarchy in P6
  • Project Settings — duration format (Days/Hours/Weeks), default activity type, default duration type, default cost account — setting up a P6 project correctly before building the schedule
  • Project Codes — creating and using project codes (Project Type: EPC/Construction/Infrastructure, Phase, Region, Client) — filtering and grouping across multi-project EPS views
  • Activity Codes — creating user-defined activity codes (Phase, Discipline: Civil/Mechanical/Electrical, Area, Contractor, System) — professional P6 schedule organisation for client reporting
M3

Work Breakdown Structure (WBS) & Activity Creation

  • WBS fundamentals — deliverable-based vs phase-based WBS, WBS dictionary, WBS coding standards (1.0 / 1.1 / 1.1.1), WBS depth best practices for EPC projects
  • Creating WBS in P6 — WBS dialog, adding WBS levels, WBS bands in Gantt view, WBS Summary activities (automatically calculated rollup), WBS-level budget tracking
  • EPC project WBS example — Engineering (Process, Mechanical, Civil, Electrical, Instrumentation) → Procurement (Equipment, Piping, Steel, Electrical) → Construction (Civil, Structural, Mechanical, Piping, Electrical, Instrumentation) → Commissioning — building a realistic EPC WBS
  • Activity Types — Task Dependent (most common), Resource Dependent (duration adjusts with resources), Level of Effort (administrative/continuous span), WBS Summary, Start Milestone, Finish Milestone — when to use each type
  • Duration Types — Fixed Duration & Units (duration stays fixed — most common in construction), Fixed Units (resource quantity fixed — duration adjusts), Fixed Duration & Units/Time (productivity fixed)
  • Percent Complete Types — Duration % (elapsed time), Physical % (manually estimated — preferred for construction activities), Units % (resource consumption based) — appropriate selection by activity type
  • Adding activities — Activity Details tabs (General, Status, Resources, Predecessors, Successors, Codes, Notebook, Steps, Feedback) — fully documenting an activity record in P6
  • Milestones — Start and Finish Milestones for contractual deliverables (Notice to Proceed, Design Complete, First Concrete Pour, Mechanical Completion, Substantial Completion, Final Handover)
M4

Activity Relationships, Logic & Constraints

  • Relationship types — Finish-to-Start FS (B cannot start until A finishes — most common), Start-to-Start SS (B cannot start until A starts), Finish-to-Finish FF (B cannot finish until A finishes), Start-to-Finish SF (least common)
  • Lag and Lead — Lag (positive delay: concrete curing 7 days after pour — FS+7d), Lead (negative lag: procurement starts before design completes — SS-14d) — entering lag/lead values in P6
  • Adding relationships in P6 — Predecessors/Successors tabs in Activity Details, drawing relationship lines in Gantt view, Activity Network (logic diagram) view — multiple methods
  • Schedule constraints — difference between logic-driven scheduling (preferred) and imposed date constraints (Mandatory Start, Mandatory Finish, Start On or Before/After, Finish On or Before/After) — when to use constraints and their impact on CPM Float
  • Network logic review — Activity Network view, Trace Logic view (predecessor/successor chain), filtering for open-ended activities (no predecessors or no successors — common logic errors)
  • Logic loops — what is a circular dependency (A requires B which requires A), how P6 detects and reports logic loops, correcting logic loop errors — common scheduling mistakes
  • Schedule compression techniques — Crashing (adding resources to shorten critical activities — cost vs time trade-off analysis), Fast-Tracking (overlapping sequential activities — risk assessment), what-if scenario planning in P6
  • Activity Steps — adding progress steps within a single activity for detailed physical % complete tracking (useful for complex multi-day activities like equipment installation or testing procedures)
M5

Resources, Cost Loading & Resource Levelling

  • Resource Types — Labour (people charged by hours/days: Civil Engineer, Mason, Welder, Electrician, Supervisor), Non-Labour (equipment charged by hours: Crane, Excavator, Concrete Pump, Formwork), Material (consumables: Concrete m³, Steel MT, Cable m)
  • Resource Dictionary — creating resources (Resource ID, Name, Type, Default Units/Time, Price per Unit, Resource Calendar assignment, Resource Codes, Resource Roles)
  • Assigning resources to activities — Resources tab in Activity Details, units per time (productivity rate), budgeted units (total quantity), multiple resources per activity (crew composition for civil works)
  • Resource histograms — resource usage profile showing manpower peaks and troughs, resource usage table (daily/weekly/monthly), identifying over-allocated resources (shown in red in P6)
  • Resource Levelling — automatic levelling algorithm (Preserve scheduled early dates vs Level within Total Float), manual levelling by delaying non-critical activities, impact on project finish date
  • Cost accounts and Expense categories — Cost Account structure (aligned to WBS — Civil Works, Structural Steel, Mechanical Equipment, Electrical, Instrumentation, Commissioning), Expense Categories (Direct Labour, Material, Equipment Hire, Subcontract, Overheads)
  • Budget and Spending Plan — entering Budgeted Cost at activity level and WBS level, project Budget Summary, distributing budget by time period (time-phased budget) — building a cost-loaded schedule for EVM tracking
  • P6 Cost and Resource Reports — Project Expenses, Activity Cost, WBS Cost Summary, Earned Value cost data — connecting resource and cost loading to monthly project progress reports
M6

CPM Scheduling — Critical Path & Float Analysis

  • What happens when you press F9 (Schedule) — data date concept, schedule calculation settings, schedule log warnings and errors review
  • Forward Pass — calculating Early Start (ES) and Early Finish (EF) from left to right through the activity network — determining the earliest each activity can start and finish
  • Backward Pass — calculating Late Start (LS) and Late Finish (LF) from the project end date backward — determining the latest allowable dates without delaying project completion
  • Total Float (TF) — LS − ES — amount of time an activity can be delayed without delaying project end date; identifying Critical Activities (TF = 0) and Near-Critical Activities (TF ≤ 5 days)
  • Free Float (FF) — amount an activity can be delayed without delaying its immediate successors — local scheduling flexibility between linked activities
  • Critical Path identification in P6 — highlighting critical path with red Gantt bars, critical path filter, Longest Path option vs Total Float = 0 definition, multiple critical paths in complex EPC schedules
  • Schedule Options — advanced P6 scheduling configuration: ignore relationships to/from other projects, make open-ended activities critical, Use Expected Finish dates, Calculate float based on Finish Date
  • What-If Analysis — P6 what-if scenario, testing impact of activity duration changes, logic revisions, added constraints on project finish date and critical path — essential skill for delay analysis and contract claims preparation
M7

Baseline, Progress Tracking & Earned Value Management (EVM)

  • Baseline concept — why a baseline is essential (snapshot of approved scope + schedule + cost), types of baselines in P6 (Project Baseline, User's Original, User's Baselines 1/2/3), baseline management best practices
  • Creating a Project Baseline — Maintain Baselines dialog, Convert current schedule to new baseline, Copy current project, assigning Project Baseline vs User's Baselines — when to update vs preserve baseline
  • Baseline bars in Gantt — displaying baseline bars below current bars, baseline start/finish column display, variance columns (Start Variance, Finish Variance, Duration Variance, Total Float Variance)
  • Updating project progress — setting Data Date (progress update cutoff date), updating Actual Start, Remaining Duration, % Complete, Actual Finish for completed activities — weekly update workflow
  • Schedule update best practices — what to update vs what not to change in live schedules, out-of-sequence progress handling, maintaining schedule integrity during execution updates
  • Earned Value Management (EVM) — enabling EVM in P6, PV (Planned Value = BCWS), EV (Earned Value = BCWP), AC (Actual Cost = ACWP), calculating SV/CV/SPI/CPI — understanding what each metric means for project health
  • EVM Forecasting — Estimate at Completion (EAC = BAC ÷ CPI), Estimate to Complete (ETC), Variance at Completion (VAC), To-Complete Performance Index (TCPI) — forecasting final project cost from current P6 data
  • Schedule Delay Analysis — comparing baseline vs current schedule, slipped activities identification, delay categorisation (Owner/Contractor/Neutral delays), generating delay analysis reports for contract administration and claims
M8

Reports, Real EPC Projects & Interview Preparation

  • Primavera P6 Reports — built-in report categories (Project, Activity, Resource, Cost, Tracking, WBS), Report Wizard (tabular reports with group/sort/filter), exporting to PDF and XLS
  • S-Curve generation — Resource/Cost Usage Profile (planned vs actual S-Curve), cumulative progress % vs time, Planned vs Actual S-Curve comparison — standard monthly progress report deliverable
  • Resource Histogram — manpower usage profile by time period, cumulative histogram, planned vs actual resource deployment — mobilisation and demobilisation planning for construction sites
  • Look-Ahead Schedule — 3-week and 4-week look-ahead (filtering activities starting within N days), printing look-ahead for site supervisors — key tool for weekly site coordination meetings
  • Custom Layouts — professional presentation-quality P6 Gantt (bar labels, relationship lines, baseline bars, critical path colour, WBS banding, grouped by Phase/Area/Discipline) — the skill that separates senior planners from juniors
  • Real Project 1 — Construction Schedule: complete 18-month multistorey building schedule (Site Prep → Foundation → Structural → MEP → Finishing → Handover) with resources loaded, baseline set, and one progress update cycle with variance analysis
  • Real Project 2 — EPC Power Plant Schedule: complete EPC schedule (Engineering all disciplines → Procurement → Civil Construction → Mechanical Erection → Piping → Electrical & Instrumentation → Pre-Commissioning → Commissioning & Startup) with milestone tracking and S-Curve reporting
  • Primavera P6 Interview Preparation — top 40 Primavera planning interview questions (CPM, float types, relationship types, baseline management, EVM metrics, resource levelling, schedule update procedures, delay analysis), scenario-based questions from EPC/construction planning roles, resume writing for Planning Engineer and Project Controls positions

📄 Download Full Primavera P6 Course Syllabus & Sample Project Files — free with course enquiry

Primavera P6 Skills You Will Master

Key Primavera P6 Features & Skills Covered

🌳 WBS — Work Breakdown Structure
🔗 Activity Relationships (FS/SS/FF/SF)
🔴 Critical Path Method (CPM)
🕐 Total Float & Free Float
👷 Resource Loading & Levelling
💰 Cost Loading & Cost Accounts
📌 Baseline Management
📊 Progress Tracking & Update
💹 Earned Value EVM (SPI/CPI)
📈 S-Curve & Resource Histogram
📄 Reports & Look-Ahead Schedule
🔁 XER / XML / XLS Data Exchange
Career Opportunities

Jobs You Can Get After Primavera P6 Course

📋

Planning Engineer

₹5–14 LPA

Build and maintain project schedules in Primavera P6 at EPC companies, construction firms, and infrastructure developers — the primary Primavera role in India

📊

Project Controls Engineer

₹6–16 LPA

Monitor EVM metrics (SPI, CPI), generate S-Curves and progress reports, identify schedule risks and recommend corrective actions to project management

🏗️

Construction Planner

₹5–12 LPA

Develop and update construction schedules for buildings, roads, metros, bridges, and civil infrastructure — the largest employer of Primavera engineers in India

⚙️

EPC Project Scheduler

₹6–18 LPA

Schedule Oil & Gas, Power Plant, Petrochemical, and Industrial EPC projects from Engineering through Commissioning — including international postings

💼

Project Manager

₹10–28 LPA

Lead entire projects using Primavera as the planning backbone — managing schedule, cost, and risk for major construction and EPC projects at senior level

🌏

International Planning Role

₹25–60 LPA equiv.

UAE, Saudi Arabia, Qatar, Oman, Africa — international EPC and construction projects actively recruit Primavera-trained Indian planning engineers

Eligibility

Who Should Join Primavera P6 Course?

🏗️
Civil & Structural Site Engineers

Working civil engineers with site execution experience who want to move into planning roles — Primavera P6 is the single most powerful career upgrade for a site engineer, typically doubling salary and opening international opportunities.

⚙️
Mechanical & Piping Engineers

Mechanical engineers working in EPC, oil & gas, or power projects who want to move into project planning — P6 combined with mechanical domain knowledge is highly valued in EPC projects for scheduling equipment and commissioning activities.

🎓
Fresh B.Tech / BE Civil / Mechanical Graduates

Graduates who want to enter the construction or EPC sector as planning engineers from the start — combining an engineering degree with Primavera P6 skills is a powerful differentiator, commanding immediate Planning Engineer salaries.

💼
Project Coordinators & Managers

Project coordinators and managers using Excel or MS Project who want to upgrade to Primavera P6 for enterprise-scale scheduling and controls — essential for senior PM roles at large EPC companies.

🌏
Engineers Targeting International Postings

Engineers in India who want planning or project controls roles in Middle East EPC and construction — Primavera P6 is the non-negotiable requirement for almost all international planning roles, and Indian P6-trained engineers are in very high demand.

📊
MS Project Users Upgrading to P6

Professionals already using MS Project for smaller projects who want to move into large-scale EPC or construction planning — Primavera P6's enterprise features, resource levelling, and EVM capabilities are significantly more powerful for complex multi-disciplinary projects.

Student Reviews

What Our Students Say

★★★★★

"I was a Civil Site Engineer with 3 years of site experience but no planning software knowledge. MMIIT's Primavera P6 course completely transformed my career. The WBS and CPM modules taught me to think about projects from the top down. Building a real construction project schedule with resources loaded, baseline set, and weekly progress updates was the most valuable professional exercise I have ever done. I placed as a Planning Engineer at an EPC company in Noida at ₹7 LPA within 3 weeks — nearly double my previous salary. Best Primavera P6 training near Dwarka Mor Metro Delhi."

SN
Sandeep NairSite Civil Engineer → Planning Engineer ₹7 LPA (Noida)
★★★★★

"I am a Mechanical Engineer who was working in an oil refinery project as a site execution engineer. MMIIT's course took me from zero to building complete EPC project schedules independently. The Resource Loading module was the most revelatory — understanding how manpower histograms are built and resource-levelled in P6 changed how I think about project execution. The EVM module (SPI, CPI, S-Curve) was completely new to me and extremely valuable. I got a Planning Engineer role with a Middle East posting at a package equivalent to ₹30 LPA. Exceptional training at MMIIT Dwarka Mor."

AK
Arjun KrishnanSite Mechanical Engineer → Planning Engineer (Middle East) ₹30 LPA equiv.
★★★★★

"I completed my B.Tech in Civil Engineering and joined MMIIT's Primavera P6 course immediately after graduation. As a fresher, the Real EPC Project case study (power plant schedule — Engineering, Procurement, Construction, Commissioning) is what set my portfolio apart in every interview. When I demonstrated the S-Curve and EVM analysis I had built in P6, interviewers were visibly impressed. I placed as a Junior Planning Engineer at an infrastructure company in Delhi at ₹5.5 LPA — excellent for a fresher. MMIIT's Primavera training in Dwarka Mor is outstanding."

RT
Rahul TiwariB.Tech Civil Fresher → Junior Planning Engineer ₹5.5 LPA (Delhi)
FAQs

Frequently Asked Questions

Have more questions? Call us at +91-7838180031 or visit MMIIT at Dwarka Mor Metro, Delhi. Free counselling & demo class Mon–Sat, 9AM–8PM.

MMIIT's Primavera P6 course is 3 months long, covering Project Management Fundamentals, P6 Interface, EPS/OBS/Calendars/Project Setup, WBS, Activity Types & Duration Types, Activity Relationships (FS/SS/FF/SF, lag/lead), Resources & Cost Loading, Resource Levelling, CPM Scheduling (Total Float, Free Float, Critical Path), Baseline Management, Progress Tracking & Update, Earned Value Management (PV/EV/AC/SV/CV/SPI/CPI), S-Curve & Reports, and Real EPC/Construction Project scheduling cases with Interview Preparation. Morning, evening, and weekend batches at Dwarka Mor.
Oracle Primavera P6 is the world's most powerful project scheduling software — the industry standard for Construction, EPC, Infrastructure, Oil & Gas, Power, and Defence projects in India and globally. Used by L&T, Shapoorji Pallonji, Tata Projects, NPCIL, ONGC, NHPC, Reliance, GMR, and all major EPC contractors. India's NIP infrastructure programme (₹111 lakh crore) has created an acute shortage of trained Primavera planning engineers. Planning Engineer and Project Controls roles with P6 skills command ₹5–18 LPA in India and excellent packages (₹25–60 LPA equivalent) for international EPC postings.
MS Project suits small-medium projects (50–500 activities) in corporate, IT, and general business settings. Oracle Primavera P6 is designed for large complex projects (500–100,000+ activities) in EPC, Construction, Infrastructure, Oil & Gas, Power, and Defence — with enterprise multi-project management, advanced resource levelling, detailed cost accounts, full Earned Value Management, and robust baseline management. In EPC and infrastructure sectors, P6 is the mandatory standard. P6 skills command significantly higher salaries than MS Project skills in planning careers.
CPM (Critical Path Method) identifies the longest path through a project network — activities with zero Total Float that determine the project's minimum completion date. After entering activities and relationships in P6, pressing F9 (Schedule) automatically calculates: Early Start, Early Finish (Forward Pass), Late Start, Late Finish (Backward Pass), Total Float, Free Float, and the Critical Path (highlighted red in Gantt). Activities with Total Float = 0 are critical — any delay to them delays the project end date. CPM mastery is the most fundamental skill for any planning engineer.
MMIIT's Primavera P6 course fee is approximately ₹15,000 for the full 3-month programme, with monthly instalment options. Fee includes all P6 training, live software practice, real EPC/construction project files, EVM and S-Curve exercises, interview preparation, and placement support. Call +91-7838180031 for latest batch details.
Yes — real project practice is the core of the course. Students build a complete construction project schedule (multistorey building, 18 months) and an EPC power plant schedule (Engineering → Procurement → Construction → Commissioning) — from WBS through resource loading, CPM scheduling, baseline creation, weekly progress updating, and S-Curve generation. These real project files form a portfolio directly presented in planning engineer job interviews.
Yes — Primavera P6 is the single most valuable skill for international EPC and construction careers. Middle East (UAE, Saudi Arabia, Qatar, Oman), Africa, and South-East Asia EPC markets actively recruit India-trained Primavera planning engineers. International Planning Engineer packages typically offer ₹25–60 LPA equivalent including tax-free salary, accommodation, transport, and air ticket allowances. Many MMIIT Primavera graduates secured Middle East planning roles within 6–12 months of completing the course.
Yes. MMIIT offers both offline classroom training at Dwarka Mor and live online/hybrid Primavera classes with the same curriculum, real EPC project files, EVM exercises, and placement support. Call +91-7838180031 to check online batch availability.
MMIIT is at Plot No. 65, Opposite Gate No. 2, Dwarka Mor Metro Station, Uttam Nagar, New Delhi – 110059. Just 2 minutes walk from Dwarka Mor Metro Gate 2 (Blue Line) — easily reachable from Dwarka, Uttam Nagar, Janakpuri, Vikaspuri, Rajouri Garden, Karol Bagh, and across Delhi NCR.
After the Primavera P6 course, you can apply for Planning Engineer, Project Scheduler, Project Controls Engineer, Construction Planner, EPC Project Scheduler, and Junior Project Manager roles at EPC companies (L&T, Shapoorji, Tata Projects, Afcons), infrastructure developers (GMR, GVK, Adani, Sterlite), oil & gas companies (ONGC, Reliance, BPCL), power sector (NPCIL, NHPC, Adani Green), and PMC firms — ₹5–20 LPA India, ₹25–60 LPA equivalent internationally.
Visit Us in Person

Master Primavera P6 & Launch Your Planning Career! 📊🚀

Join 75+ engineers who transformed their careers with Primavera P6 at MMIIT. Free demo class available — new P6 batches starting soon at Dwarka Mor, Delhi!

WhatsApp MMIIT Call MMIIT